Construction progress at the end of May 2022: Overcoming weather difficulties, HVC ensures the quality of the work
01/06/2022
At the end of May, many provinces across the country appeared moderate rain, heavy rain, in some places very heavy rain seriously affected the construction process at majorconstruction sites of HVC Group . However, in the spirit of overcoming difficulties, HVC's staff has overcome the outstanding problems, accelerated construction to ensure the progress, quality and beauty of each item.
NovaWorld Phan Thiet Water Park
HVC Group was contracted by Novaland Group to design water filtration, water treatment, supply and construction of all technology. With practical experience in dozens of water park projects across the country, HVC is confident to complete the project on schedule, satisfying the investor.
Chemical room for water treatment
As previously reported, HVC Group has completed the construction of pipelines from water return points, overflow collection, bottom collection, tanks emptying to filter rooms. Item of construction of pipelines from pump rooms to slide towers has also been completed. Currently, the installation process of water filter rooms reaches 95%.
Water supply to Complex1 . slide tower
Nguyen Dai Han (Project Manager) said: “On May 23, 2022, after only 2 hours of heavy rain, the entire NovaWorld Phan Thiet water park was flooded. Heavy rains cause landslides, causing mud, materials to be swept into warehouses and many other locations.
The BCH quickly came up with drastic and timely response plans, so the situation was controlled without loss of life and property. However, the amount of mud and soil carried along with water into the warehouse and the project is very large. As soon as the rain stopped and the water receded, we cleaned up and it took about a week for everything to stabilize.”
Water supply to Complex3 . slide tower
This is the second heaviest rain this month. Before that, during the holiday of April 30 - May 1, heavy rain lasted for more than 3 hours, flooding the entire construction site, engine room, warehouse, and employees' houses, affecting the exam process. work and daily life.
HVC works at King Garden Resort & Villas
At the project, which is compared to an ideal four-season resort, HVC Group is the general contractor for the design, supply and installation of hundreds of swimming pools of a system of high-class villas.
HVC is building villas Thanh Dong - Minh Duc - Hong Lien
News from the construction site, Koi fish tank No. 2 of Dong Do - Phu Gia area is 100% complete. The Onsen system and hot spring swimming pool of this villa area are still in the process of constructing pipes around the pool, preparing to install engine room equipment.
Koi fish tank number 2
In parallel, HVC is installing pipes around the swimming pool and supplying hot mineral water to 25 villas of Thanh Dong - Minh Duc - Hong Lien area.
Onsen tanks and hot springs are being piped
It is expected that in the coming time, HVC will construct more items of Onsen pool, hot mineral spring and 18 swimming pools in Kaiwa area.
Yoko Onsen Quang Hanh
In this project, HVC Group undertakes the supply and installation of complete hot and cold saunas for 170 villas. In particular, the technology of freezing snow is considered the "soul" of Yoko Onsen Quang Hanh.
Install compressor for cold room system
It is known that the process of construction and installation of hot and cold sauna technology for 105 villas in phase 1 has been completed up to 98%. Still according to the old plan, on June 20, 202 HVC will hand over 105 villas of phase 1. Phase 2 includes 65 villas and is expected to be completed on September 20, 2022.
Construction of the sauna machine crankcase for the sauna room system
Install the control panel for the nebulizer
Apec Mandala Wyndham Mui Ne
At the Apec Mandala Wyndham project (Phan Thiet, Binh Thuan), HVC designs, supplies, installs and constructs mud baths, spas and 64 swimming pools, villas, jacuzzi systems, 4 swimming pools. Rooftop infinity pool, 1 auxiliary building swimming pool.
Currently, the items signed in the contract have been constructed by HVC 82% and are in the process of completing the installation of swimming pool engine rooms. Despite the barriers of the weather due to heavy rain, the Apec Mandala Wyndham Mui Ne construction site still increased the implementation of the remaining items. It is expected that on June 30, it will be completed and put into trial operation.
Complete installation of pool machine rooms
Construction of mud bath
Apec Mandala Sky Villa Hoa Binh
HVC Group is the unit of design, supply and construction of electromechanical systems, light electricity, water supply and drainage and fire protection at the project.
Over the past time, the construction process at Apec Mandala Sky Villa was partially affected by the delay in handing over the site by the contractor, the other part stemming from the investor changing the design, converting the purpose from the apartment. sold to self-operated. However, HVC Group still tries to build, ensure the progress and quality of the signed items.
Vinhomes Dream City Hung Yen
Vinhomes Dream City is considered a "dream city" with many types of housing and modern facilities. Here, HVC was assigned many important bidding packages by Vingroup investor.
Saltwater river in central park 18Ha
It is known that in May, HVC accelerated the completion of 4 main bidding packages including: Construction of fake waterfall technology of 18Ha central park; M&E M&E Ring Road 3.5; Supply and installation of saltwater generation technology for wave pools and saltwater rivers in 18Ha central park; Lighting system for 5B highway intersection with belt 3.5 and DH17 intersection for ring road 3.5 with Hai Phong highway.
The technology of fake mountain waterfall and salt production has been completed by HVC
Mr. Nguyen Xuan Truong (Director of HVC M&E) added, the construction package of the 2nd and 3rd phase of infrastructure M&E system of 2,400 low-rise apartments is waiting for the investor to hand over the premises for deployment. It is expected that in mid-June, HVC will embark on this category.
The electromechanical system of the ring road 3.5 and the intersections has been completed 100%
Vinhomes Dai An
At the Vinhomes Dai An construction site, torrential rain in the past few days has flooded some items, creating a lot of mud, hindering the construction process.
As for the M&E, HVC has completed the M&E construction of the office of the Project Management Board since the beginning of May. With the M&E package of the main road infrastructure for sales, the investor has not yet handed over the premises. However, HVC has fully prepared human and material resources to be ready for construction to ensure progress.
Installation of pipes for outdoor swimming pools
Tender packages for high-end entertainment technology are still on track and on schedule. The technology construction category for 2 outdoor swimming pools according to Olympic standards has reached 50%, currently installing pipes around the pool. The bidding package for the supply and installation of technology for salt water filtration systems, salt supply and salt production for indoor swimming pools in Dai An Cultural Center Park is in the pipeline installation stage.
Particularly, the mini water park game technology package including 1 children's swimming pool and 4-game slide is still in the process of waiting for the site to be constructed.
A category of mini water park
It can be seen that at this time our country is entering the rainy season, but despite the harsh weather, employees on construction sites throughout the country still work hard to join hands to build HVC into an economic group. Private, strong brand sustainable development.