HVCgroup receive construction orders for government office art fountains
24/07/2020
The project has a scale of 9 floors, a total floor area of 24,686m2 located at 1 Hoang Hoa Tham - Ba Dinh - Hanoi. The project is designed and built with strict standards to ensure its solemnity, sustainability, and dignity, demonstrating the position of the government when working and welcoming foreign guests.
HVC Group is instructed to construct a fountain in the lobby of a building with a volume of 30m3, with a system of nearly 40 nozzles from 1.6 to 5.5m. Especially, the whole project uses German equipment and technology operating and controlling automatically.
