HVC finish building water park in Muong Thanh Ecological Park - ready for trial run and hand-over
22/02/2017
Right after Tet Holidays, HVC has actively implement incomplete works to put in readiness for hand-over process in 30 April. Bystrong capability and goodwill, HVC continuouslybe chosen by large Group as contractor in designing, supplying materials and installing high quality entertainment facilities.At the project Muong Thanh Ecological Park in Dien Chau - Nghe An, which is owned by Muong Thanh Group, HVC has just finished supplying materials and installing of water park’sentire slide system andfilter system. On March 2017, the work is expected to be operated and will be handed over to the owner, ensure engineering, quality standard and timeline in accordance with owner’s requirements and government’s regulation.
Muong Thanh Ecological Park have an area of 300ha with estimated investment of 3000 billion dongs. It possess Vietnam’s biggest wild animals zoo with many rare animals; playground and water park; mineral mud bath area; spititual area. The water park is ready for OpeningDay on 30 April holiday in new tourism address of Nghe An and Central Vietnam.
Below are some picture in jobsite:
High speed slides was established
Play house for children is well-functioning
Spiral slides are under cleaning process
The lobby inside the water park is ready
Super bowl water slide view from heights
Water park’s view from outside
The lazy river is about to be supplied with water
Tornado water slide promises unparalleled thrills
Rainbow gallery, a beautification of the lazy river