Completing a series of swimming pools in projects, HVC Group continues to elevate its position in the market
13/03/2023
Determined to focus on strong industries, recently, HVC Group has completed many large-scale swimming pool projects at projects, continuing to raise its position in the entertainment equipment market high class.
Four Seasons Lake - Vinhomes Dai An
In Vinhomes Dai An (Hung Yen), besides the technology packages that have been handed over, HVC also implements the construction of a bidding package to supply and install technology for filtration systems, water heating, salt supply and swimming pool salting. in the central park area. In February 2023, HVC completed and handed over this item to the investor to put it into use.
The indoor saltwater swimming pool, also known as the Four Seasons, has a total capacity of 2449m3, designed with a filtration and heating system to ensure four-season operation. In winter, the water in the pool reaches a temperature of 30 - 34 degrees Celsius, this is considered the ideal temperature for swimming and ensuring health.
The Four Seasons lake is connected to the Tropical Lagoon 2.8ha, which opens up a swimming space inside - outside - night - day suitable for all weather.
HVC's technology engineer said: “Because Four Seasons uses salt water, which is an indoor four-season tank, the use time is longer than outdoor tanks. So we used the same MBR membrane filter for the salt lake. MBR is a filter with modern technology, giving better filtration performance than traditional sand filter, meeting water quality standards, stable and convenient operation."
Apec Mandala Wyndham Mui Ne
Also in February 2023, HVC completed the package of design, supply, installation and construction of swimming pool technology at Apec Mandala Wyndham Mui Ne (Phan Thiet City, Binh Thuan). Specifically, HVC has "launched" 69 swimming pools, including 64 villas, 4 infinity pools located on the attic floor and 1 infinity pool in the ground floor landscape area of the project.
If 64 swimming pools villas with an area of 7.6m2 have a massage system that gives residents optimal relaxing moments, then 4 rooftop swimming pools of 180m2 bring many impressive experiences. In addition, with an area of 330m2, the infinity pool on the ground floor landscape will also contribute to meeting the swimming needs of residents and visitors.
Currently, HVC is in the process of commissioning and testing. The package is expected to be handed over to the investor in March 2023.
King Garden Resort & Villas
HVC is responsible for providing equipment, constructing island villa swimming pool, mineral spring swimming pool - onsen and water playground at King Garden Resort & Villa. In 2022 alone, HVC continuously completed and handed over 50 swimming pools of villas in Kim Lien, Dong Do - Phu Gia areas, 1 hot mineral swimming pool, 1 Onsen swimming pool in the center of the project.
From the beginning of 2023, HVC has completed 18 more swimming pools of villas in Kaiwa area and hot spring swimming pool, serving to welcome tourists on the occasion of the Lunar New Year. In addition, the water playground is also handed over to meet the needs of the investor.
With the trust of Thang Long Invest, in this project, HVC has just signed 2 more contracts to supply and install hot mineral water supply systems for 78 villas and 81 Shophouses.
Outdoor swimming pool - Eurowindow Twins Parks
HVC Group is the construction contractor for the supply and installation of an outdoor swimming pool system including an adult pool and a children's pool with a total area of 413m3 at Eurowindow Tiwn Park. This is considered one of the expensive utilities, contributing to creating a quality and classy living space, helping this place become a true "settlement and career" place.
Immediately after signing the contract, HVC Group began to carry out the work of receiving the site, fully preparing human and material resources to be ready for construction to ensure on schedule. Recently, this item has been completed by HVC and is currently waiting for water supply for commissioning.
Swimming pool at Vinhomes Star City project
Previously, at Vinhomes Star City, HVC Group completed and handed over to investor Vingroup many construction items, including: Inter-school swimming pool, outdoor swimming pool, landscape fountain, gate fountain Hello.
Following the success, HVC was assigned the task of constructing an outdoor swimming pool in Huong Duong subdivision (274 villas). This swimming pool category has an area of more than 400m2 including an adult pool, a children's pool and a landscape, constructed by HVC and completed on schedule.
Private swimming pool in Hanoi, Ha Nam
Besides the swimming pool projects of hotels, resorts, villas, apartments, sports areas, commercial centers... HVC also constructs a swimming pool package for individual customers.
In Soc Son district (Hanoi), HVC executes a package of equipment supply, installation of water treatment and filtration technology for private resort villas. Up to now, this project has been completed with a separate 650m2 swimming pool between the swimming pool and the jacuzzi, receiving high satisfaction and appreciation from customers.
In the Phu Ly (Ha Nam), HVC designed, supplied equipment and built a swimming pool package for Mr. Do Trung Kien's family villa. This swimming pool has an area of 40m2, located in the infrastructure connecting the stairs, contributing to creating a luxurious space for the villa.
With the mission to bring to the market high quality products and services, over the past decade, HVC Group has always been evaluated as the "No. 1 unit in Vietnam in the field of general contractor for design, supply, construction and installation of swimming pools". . Some typical swimming pool projects include: Vinhomes Riverside, Royal City, Premier Village Phu Quoc, Dusit Princess Moonrise Beach Resort, Madison Ho Tram, Vincom Long Bien infinity pool, Vinpearl Golf Land Resort & Villas Nha Trang …
Mr. Thieu Tuan Tu - swimming pool engineer of HVC Group said: "At HVC, besides design, construction and installation capabilities, we always focus on using modern equipment from brands. Big brands such as Astralpool (Spain), Bropools (Hong Kong), Jdpool (Thailand), Maytronics (Israel)... Equipment selection is an important step because if the device is of poor quality, unknown origin will affect the device. greatly affect the life of the system, the operation process as well as the health and experience of the pool users.”